天宇综合楼施工组织设计

联系方式:点击这里给我发消息QQ212181988
官方主页:www.biye114.com
图片预览: 没有预览图片;论坛转帖
插件情况:
售后服务:请联系客服QQ:212181988
一键分享拿折扣:
  • 好的评价 如果您觉得此软件好,就请您
      0%(0)
  • 差的评价 如果您觉得此软件差,就请您
      0%(0)

软件简介

 摘要
在整个建设工程项目的招投标过程中,施工组织设计起着非常重要的作用。它对项目管理机构设置、施工总体部署、主要分部分项工程施工方案、现场安全文明施工措施环境保护措施、技术节约及降低成本措施等方面尽可能做到充分考虑,以达到全面性、科学性、适用性即及针对性,是确保最终顺利完成工程项目的建设。本设计以“天宇综合楼施工组织设计”为例进行技术投标文件设计。在技术投标文件设计的过程中,通过认真研究招标文件中对于技术标的要求,了解各项规章、规程,并查阅相关文献,编制了一份完整的施工组织设计。过程中运用了Project2007、CAD等软件来完成文件中的部分内容。最终成果包括:施工组织设计编制依据、组织结构、施工准备、施工进度计划、施工管理措施以及施工现场平面布置图和施工进度计划横道图等内容。
关键词:施工部署 施工准备 平面布置 进度计划


目录

1.编制依据·································································1
1.1设计图纸及工程招投标文件······································1
1.2国家及地方有关标准规范规程······································2
2.综合说明··························································3
2.1工程总体概述·························································3
2.2建筑设计概况··························································3
2.3结构设计概况··························································4
2.4工程特点·····························································4
2.5施工条件·····························································4
2.6工程、重点难点·························································4
2.7工程标准·····························································4
3.施工总平面布置···························································5
3.1平面布置原则··························································5
3.2平面布置依据··························································5
3.3各施工阶段平面布置····················································5
3.4主要生产、生活设施布置·················································6
3.4.1生产设施布置·····················································6
3.4.2生活设施布置······················································6
3.5施工用水····························································6
3.6施工用电·····························································6
3.7施工现场平面布置原则··················································6
3.7.1管理原则·························································6
3.7.2平面管理体系······················································6
3.7.3管理计划的制定····················································6
3.7.4管理计划的实施·················································7
4.施工部署·····················································8
4.1项目管理部组织机构····················································8
4.1.1项目经理部的设置原则··············································8
4.1.2项目主要部门人员配备及其职责·····································8
4.2劳动力计划·····················································8
4.3施工进度计划·····················································8
4.3.1工期安排·····················································8
4.3.2施工进度计划图···················································8
4.4施工进度和工期保证措施···············································8
4.4.1施工组织保障措施··················································9
4.4.2工序管理保障措施··················································9
4.4.3劳动力、机械设备保证措·············································9
4.4.4工期保证措施·····················································9
4.4.5资源投入保证措施·················································10
4.4.6外部环境因素保证措施·············································10
4.4.7季节性施工保障措施··············································10
4.5主要施工机械设备·····················································10
5.基础工程(地下室)施工方案···············································10
5.1定位测量·····················································10
5.2降水措施·····················································10
5.3土方开挖·····················································11
5.4桩头的处理及垫层施工················································11
5.5防水层施工·····················································12
5.5.1底板防水层施工··················································12
5.5.2地下室卷材防水施工···············································12
5.6钢筋工程·····················································13
5.6.1钢筋制作·····················································13
5.6.2钢筋绑扎·····················································14
5.6.3钢筋工程的质量控制要点··········································14
5.7模板工程·····················································15
5.7.1基础承台及地梁砖模施工··········································15
5.7.2墙体模板施工····················································15
5.7.3框架柱模板施工··················································16
5.7.4梁板模板施工·····················································16
5.7.5楼梯模板施工·····················································16
5.8.6现浇剪力墙模板··················································16
5.7.7电梯井筒模·····················································17
5.7.8模板拆模·····················································17
5.8混凝土工程·····················································17
5.8.1找平·····················································18
5.8.2施工缝的处理·····················································18
5.8.3砼工程的质量控制点···············································18
5.9土方回填工程·····················································19
5.9.1土料要求·····················································19
5.9.2操作要点及质量保证措施···········································19
5.9.3回填土的质量控制与检验··········································19
6.基础质量保证措施·····················································22
6.1质量管理体系图·····················································22
6.2质量控制措施·····················································23
6.2.1平面及高程控制··················································23
6.2.2材料检验控制………………………………………………………24
6.3质量保证措施····················································24
7.防沉降措施·····················································25
8.地下管线地上设施周围建筑物保护措施·····································26
8.1地下管线保护措施·····················································26
8.2地上设施、周围建筑物保护措施··········································27
9.主体结构主要施工方法和施工措施··········································28
9.1主体结构施工工序·····················································28
9.2施工测量·····················································28
9.2.1平面及高程控制··················································28
9.2.2沉降观测·····················································28
9.2.3测量监控及验线···················································29
9.3钢筋工程·····················································29
9.3.1钢筋工程施工工艺流程控制程序·····································30
9.3.2钢筋施工的质量保证措施··········································30
9.4模板工程·····················································31
9.4.1工程简况·····················································31
9.4.2柱子模板·····················································32
9.4.3框架梁模板·····················································33
9.4.4砼楼板模板·····················································33
9.4.5楼梯模板底模·····················································33
9.4.6电梯井筒模板设计·················································30
9.4.7后浇带的模板方案及外防水方案·····································33
9.4.8模板安装质量控制················································34
9.5 混凝土工程·····················································34
9.5.1混凝土配置·····················································35
9.5.2混凝土的浇筑·····················································36
9.5.3混凝土的养护·····················································37
9.5.4施工缝的处理·····················································37
9.6砌筑工程·····················································37
9.6.1工程简介·····················································37
9.6.2轻质空心砌块的施工··············································37
10.主体结构质量保证措施··················································40
10.1施工质量保证体系···················································40
10.1.1施工质量管理体系················································40
10.2工程质量保证措施····················································41
10.2.1工程样板引路···················································42
10.2.2纠正预防措施···················································42
10.2.3工程质量消项例会制度············································43
10.2.4检验、试验·····················································43
11.各种管道、线路等非主体结构施工措施··································44
11.1脚手架工程·····················································44
11.2防水工程·····················································45
11.2.1地下室防水工程································46
11.2.2屋面工程·····················································47
11.2.3卫生间防水工程·················································50
11.3装修工程·····················································51
11.3.1主要工序交叉施工原则及措施······································52
11.3.2主要分部工程施工工序···········································53
11.3.3铝合金门窗·····················································53
11.3.4木门安装·····················································54
11.3.5墙面抹灰·····················································56
11.3.6地面抹灰工程···················································57
11.4安装工程·····················································57
11.4.1管道安装工程···················································58
11.4.2给水工程·····················································58
11.4.3排水工程·····················································58
11.5施工过程质量保证措施···············································59
12.各工序的协调措施····················································60
13.冬雨季施工措施·····················································61
13.1冬季施工措施·····················································62
13.1.1冬季施工特点···················································64
13.1.2冬季施工准备···················································64
13.1.3冬季施工措施···················································65
13.2雨季施工措施···················································66
13.2.1雨期施工准备···················································67
13.2.2雨季施工措施···················································69
14.施工安全保障措施···················································71
14.1管理方针目标···················································71
14.1.1方针···················································71
14.1.2目标···················································72
14.2安全管理体系···················································73
14.3安全保证措施···················································74
14.3.1安全防护重点···················································75
14.3.2各专业工程施工安全技术措施·····································77
14.3.3安全用电···················································79
15.现场文明施工措施···················································80
15.1文明施工管理体系···················································80
15.1.1建立工地文明施工领导小组·······································80
15.2文明施工标准···················································80
15.3文明施工措施···················································80
15.3.1现场场容管理方面的措施·········································81
15.3.2现场机械管理方面的措施··········································81
15.3.3现场生活卫生管理的措施··········································81
16.施工现场环境措施···················································82
16.1环境管理目标···················································82
16.2施工现场防大气污染措施··············································82
16.3施工能够现场的水污染防止措施·······································82
16.4施工现场防噪声污染的各项措施·······································83
16.5加强施工现场噪声控制···············································83
16.6防止道路遗洒的各项措施··············································83
16.7其他污染的控制措施·················································84
17.施工现场维护措施·······················································85
18.工程验收后服务措施················································86
18.1工程交付················································86
18.2工程回访················································86
18.3工程服务和保修················································86
结束语 ········ ························································87
致谢····································································88
参考文献 ······························································89
附录····································································90

1.编制依据
1.1本工程编制依据如下
(1)设计图纸及工程招投标文
(2)高层建筑向行与筏行基础技术规范JCJ6-99
(3)建筑地基处理技术规范JGJ79-91
(4)建筑桩基技术规范JGJ94-94
(5)建筑基坑支护技术规程JGJ120-99
(6)钢筋混凝土承台设计规程CECS88:97
(7)岩土工程技术规范DB29―20―2000
(8)普通混凝土拌合物性能试验方法GBJ80―85
(9)普通混凝土长期性能和耐久性能试验方法GBJ82―85
(10)混凝土强度检验评定标准GBJ107―87
(11)地下工程防水工程质量验收规范GB50208―2002
(12)混凝土外加剂应用技术规范GBJ119―88
(13)人防工程施工及验收规范GBJ134―90
(14)粉煤灰混凝土应用技术规范GBJ46―90
(15)混凝土结构实验方法标准GB50152―92
(16)混凝土质量控制标准GB50164―92
(17)砌体工程施工及验收规范GB50203―2002
(18)混凝土结构工程施工及验收规范GB50204―2002
(19)屋面工程质量验收规范GB50207―2002
(20)建筑地面工程施工及验收规范GB50209―2002
(21)建筑防腐蚀工程施工及验收规范GB50212―91
(22)机械设备安装工程施工及验收通用规范GB50231―98
(23)通风与空调工程施工质量验收规范GB50243―2002
(24)砌体工程现场检测技术标准GB/T50315―2000
(25)混凝土泵送施工技术规范JGJ/T10―95
(26)钢筋焊接及验收规程JGJ18―2003
(27)冷拔钢丝预应力混构件设计与施工规程JGJ19―92
(28)回弹法检测混凝土抗压强度技术规程JGJ/T23―92
(29)钢筋焊接接头试验方法JGJ27―86
(30)建筑装饰工程施工及验收规范JGJ73―91
(31)建筑砂浆配合比设计规程JGJ98―2000
(32)铝合金门窗安装及验收规程JGJ103―96
(33)建筑工程冬期施工规程JGJ104―97
(34)机械喷抹灰施工规程JGJ/T105―96
(35)钢筋机械连接通用技术规程JGJ107―96
(36)钢筋锥螺纹接头技术规程JGJ109―96
(37)外墙饰面工程施工及验收JGJ126―2000
(38)超声回弹综合法检测混凝土强度技术规程CECS02:88
(39)钻芯法检测混凝土强度技术规程CECS03:88
(40)超声法检测混凝土缺陷技术规程CECS21:2000
(41)柔毡屋面防水工程技术规程CECS29:91
(42)混凝土及预制混凝土构件质量控制规程CECS40:92
(43)增强氯化聚乙烯橡胶卷材防水工程技术规程CECS63:94
(44)住宅装饰装修工程施工规范GB50327―2001
(45)建筑给水排水采暖工程施工质量验收规范GB50242―2002
(46)通风与空调工程施工及验收规范GB50243―2002
(47)建筑电气工程施工质量验收规范GB50303―2002
(48)民用建筑工程室内环境污染控制规范GB50325―2001
(49)施工现场临时用电技术规范JGJ46―88
(50)建筑施工高处作业安全技术规范JGJ80―91
(51)建筑机械使用安全技术规程JGJ33―2001
(52)建筑施工扣伴式钢管脚手架安全技术规范JGJ130―2001
(53)建筑施工安全检查标准JGJ59―99

下载地址

点击此处→注册会员上传设计赚钱
以上是大纲和介绍,如需要完整的资料请在线购买.

软件评论评论内容只代表网友观点,与本站立场无关!

   评论摘要(共 0 条,得分 0 分,平均 0 分) 查看完整评论

下载说明

* 本站所有资料均已审核通过,内容原创保密,标准格式,质量保证
* 无需注册,点击在线购买后即可获取该套毕业设计(论文)完整
* 支付后请联系在线客服QQ:212181988发送资料
  • 官方微信